Cedar Park
Second Phase of Preliminary P.U.D. Kenny
Hill from Poe and Associates presented information on behalf of the
developer, PDS Development Co., Inc., John Greenstreet. Mr. Hill is
presenting information regarding the second phase of the project. He stated
there is an open reserve between the 1st and 2nd
Phases. This phase is 17.6 acres which is proposed to have 47 Single-Family
Residential Lots zoned R-2. This is an expansion in the number of lots than
was originally proposed in Phase 2. Mr. Hill stated that the street
standards have been changed to comply with the current City of Andover street
standards. Mr. Hill stated the developer is looking at a sidewalk on Lakeside Drive or along the rear of the lots near the open reserve. Mr. Hill stated that
the two smallest lots are Lot 11, Block 2 with 9,349 sq. feet and Lot 6, Block 1 with 9,559 sq. feet. He stated that the minimum lot size on the original
plan was 9,000 sq. feet and this phase is in excess of that square footage.
Les
Mangus reminded the Committee that in the original PUD phasing it was set up
that the development of the third phase of development would trigger the
completion of Lakeside Drive north to the railroad tracks.
He
stated that we need to remind Mr. Greenstreet that this is to be done at some
point.
Ron
Roberts mentioned that there does not appear to be many houses built in the
first phase. Les Mangus stated that the developer has to have Certificates
of Occupancy for 35% of the lots to apply for the next phase of development.
Mr.
Hill asked if a railroad crossing would be required. Les Mangus stated that
it probably would be required.
Ron
Roberts asked about item 10 regarding the hedgerow. He thinks the wording is
wrong. The wording should be “All existing hedge rows on the perimeter
shall remain intact…” Mr. Hill agreed that the word perimeter should be
added and he will change item 10. Mr. Hill stated that the developer will
try to save as many of the trees in the interior of the property as
possible.
Les
Mangus stated that KGE required additional easements and has given a copy of
the request to Mr. Hill.
Motion
was made by Joe Robertson to recommend approval to the Planning Commission of
Cedar Park, 2nd Phase Final PUD with the following conditions:
1. Item B1. Crosses into
the Phase 4 area, which requires the construction of Lakeside Drive to Allison Street.
2. Item
C5. Include a permanent benchmark.
3. Item
6. Sidewalk should be along Lakeside Drive.
4. General Provision 10.
Add the word perimeter as follows: “All existing hedge rows on the perimeter
shall remain intact…”
5. Addition easements to KGE
as per drawing provided by KGE
6. Potential of lot 4 being
altered.
Motion was seconded by Quentin Coon. Motion carried
3-1 with Ron Roberts voting no.
|